UP TO 10,000 kVA | UP TO 35 kV
Oil-Immersed Transformers
Share your capacity and voltage needs.
Get a quotation tailored to your project.
- IEC 60076 Compliant
- Since 1956
- Factory Direct Pricing

WHY YIMENG POWER
Three strengths behind every project
Quality materials and careful inspection for your transformer requirements.

100% Copper or Aluminum
Exactly as specified; never substituted or misrepresented.

CRGO steel core
Premium core material supports lower no-load loss, less noise and greater efficiency.

100% factory testing
Ratio, insulation and loss checks help verify performance before delivery.
Technical specifications at a glance
Final configuration is confirmed for each project.
| PARAMETER | SPECIFICATION |
|---|---|
| Rated capacity | Up to 10,000 kVA |
| Rated primary voltage | Up to 35 kV |
| Rated secondary voltage | Configured to project requirements |
| Rated frequency | 50 / 60 Hz |
| Winding material | Copper or Aluminum |
| Standard | IEC 60076 |
Need a configuration for your project?
ABOUT YIMENG POWER
Manufacturing experience you can see
Shandong Yimeng Electric Power Equipment Co., Ltd. | Est. 1956 | Linyi, Shandong, China
Annual transformer capacity: 3 million kVA, supported by R&D, production and testing facilities.

OUR FACTORY
Built for Your Power Projects
Since 1956, Yimeng Power has manufactured transformers in Linyi, China. Our team works with you to confirm capacity, voltage, winding material and other project requirements before production.
Ready to discuss your transformer project?
Share your requirements for a tailored quotation.
FREQUENTLY ASKED QUESTIONS
Answers before you request a quote
Yimeng Power has manufactured power equipment since 1956.
01What capacities and voltages do you offer?
We offer oil-immersed transformers with capacities up to 10,000 kVA and voltage levels up to 35 kV. Share your specifications to find a suitable solution.
02Can you customize a transformer for my project?
Yes. Capacity, voltage, vector group, winding material and other specifications can be configured to meet your project requirements.
03Can I choose copper or aluminum windings?
Yes. We use the winding material confirmed in your order—copper or aluminum. We never substitute materials or misrepresent specifications.
04What standards and quality checks do you follow?
Our transformers are manufactured in accordance with IEC 60076. Each unit undergoes routine inspections and electrical testing before delivery.
05How long does delivery take?
Standard models are usually delivered within 10–25 days. Lead times for customized transformers depend on the specifications and order quantity.
06What information do you need for a quotation?
Please leave your email and a brief description of your project. We will discuss the technical details with you before preparing a quotation.
CONTACT YIMENG POWER
Tell us about your project
Leave your email to start. We will confirm the technical details with you.
Send an inquiry
Only your email is required to get started.














